Saturday itinerary

Well I pretty much have to go out for a bit. Need some groceries to get through my long weekend. Need to stop at the credit union. Then I need to come home and put pedal to the metal and get this quilting done.

Last night I got half of one long edge done. I think it’s pretty subtle but I’m good with that. Have an idea for some quilting I’d like to add but I’m going to stick with finishing the main and getting the edges/sleeve on and done. oh, label. Righto.

On a brief weirdness: something about the digital magic that makes it possible to see the schedule for a TV channel is either broken or the people doing the scheduling have put everything on auto and just walked away and now things are going astray. Things that have been at a particular time for months – one started randomly a half hour early last night, despite what the EPG said. I just happened to catch that one. No biggie most of the time, LOL. Sometimes I’d prefer to see the whole show. All sort of weird since mainly I’m just listening. Would rather listen to the whole show!

Posted in deadlines, In the neighborhood | Tagged , , | Comments Off on Saturday itinerary

What do you hide in your quilting?

20110910-002623.jpg

Posted in bobbin number, deadlines | Tagged , | 1 Comment

Experience

Experience is not freaking out when you hang the almost-finished-quilting quilt on the wall for the night and having the two long edges all rippled. Experience tells you that when the 5″ strip on each side is quilted, they will lay flat too. (I’m more than positive this had nothing to do with my sleepless night LOL. The cats on the other hand may have not been very helpful in this regard.)

Posted in cats helpful cats, deadlines | Tagged , | Comments Off on Experience

#12

Dark yellow.

I would estimate maybe 3-4 to go across top and bottom.

Posted in bobbin number, deadlines | Tagged , | Comments Off on #12

#11

On to the yellow!

Posted in bobbin number, deadlines | Tagged , | 1 Comment